Traffic Surveys for Access Roads Impacted by the Trans Adriatic Pipeline (TAP) Project

Partner: ERM
Client: TAP
Period: 2011


This traffic survey included: measurement of traffic flow in both directions of the access roads during weekdays and weekends; analysis of the results of the surveys; final survey report.

 

8368955426_6157a845dd_b

Our Clients