iStock-610677264-800x450

Construction Permit for Seka HPP

Client: Seka HPP Period: 24.05.2017 -ongoing Services for this application process include review of all documentation submitted by the company; identification of shortcomings in the first documentation; approval from the Department of Forestry Fund for using forest or pasture land;…

Devoll Hydropower Project (Statkraft & EVN) Sup ...

Client: Devoll Hydropower Partner: Mott MacDonald, Coyne et Bellier Period: November 2013 –  October 2016 The Albanian government, through an open international tender, awarded a BOOT (Build,Own,Operate and Transfer) concession in the amount of 800 million Euros to DHP. The scope…

8

Cairn Project for Oil Plant in the Adriatic Sea

In support of CAIRN’s plans to drill for oil and build an oil plant in the Adriatic Sea, this project provided a socio-economic baseline study; desk studies; interviews and consultations with potentially affected stakeholders; and support in stakeholder mapping.

36

Devoll Hydropower Project – Archaeological Survey

ABKONS and AD Star are conducting an archaeological field survey in seven sites of the area of Banjë. Phase 1 includes: screening of test points in the field; geophysics tests; and preliminary reports if any findings are identified. Phase 2 includes: monitoring

Hydroelectric-Dam-From-EMSL-on-Flickr-1

Devoll Hydropower Project (Statkraft & EVN) HSE ...

This project concerned HSE contractual and Albanian law compliance of Mott MacDonald’s management and supervision of the construction of three hydro power plants in Banja, Kokel and Moglice; identification of all applicable laws related to HSE issues; and

bebf76fa45a742c4_800x800ar

Devoll Hydropower Project (Statkraft & EVN) Sup ...

The Albanian government, through an open international tender awarded to DHP a BOOT (Build, Own, Operate and Transfer) concession. The scope of this concession is to develop hydroelectric power plants in the Valley of the Devoll River, located in the south east part of

porto romano

ENEL Power Plant Project in Porto Romano

This project was a socio-economic impact assessment of the potentially affected communities, consisting of a baseline study; desktop studies; secondary data collection; and community profiling. In addition, there were interviews and consultations with potentially

b_trip-1937

ERM’s Kalivac Hydropower Plant Project

Services provided in this project on the Vjosa River included a socio-economic baseline study; desktop studies and secondary data collection; community profiling (including interviews with institutes and entities holding data); interviews and consultations with

Validation of Compressor Stations Permitting Process ...

Client: Asprofos; C&M Engineering Period: 2015 – February 2016 This project calls for the review, translation and verification of the Engineering Design Documentation for the preparation of the application package for the compound development permitting (infrastructure building permit for compressor station)….

oil-gas-pipeline-national-parks_h

RSK Environmental and ABKONS

Function Social Field Monitor, The purpose of this role is to ensure that the social risks/impacts associated with daily construction activities are effectively managed at a site level. To achieve this the Social Field Monitor (SFM) will work under the supervision of the Senior Site

Scoping and ESIA Process

Scoping and ESIA Process

The purpose of this role is to ensure that the social risks/impacts associated with daily construction activities are effectively managed at the site level. To achieve this, the Social Field Monitor (SFM) will work under the supervision of the Senior Site Representative and Social

26

Wind Sun and Water Initiative

This project proposed to build an energy park that would use wind turbines to produce electricity. This park would be built in the municipalities of Xarre, Ksamil and Livadhja, which are parts of city of Saranda. ABKONS conducted public consultations and public

Wind Sun and Water Initiative

Client: Wind Sun and Water Initiative Partner: GR ALBANIA Period: “January 2012 – December 2012” This project proposed to build an energy park that would use wind turbines to produce electricity. This park would be built in the municipalities of Xarre,…

ENEL Power PlantProject in Porto Romano

Client: ERM Period: March 2009 – October 2009″ This project was a socio-economic impact assessment of the potentially affected communities, consisting of a baseline study; desktop studies; secondary data collection; and community profiling. In addition, there were interviews and consultations with…