Environmental and Social Due Diligence for the Alban ...

Client: Ove Arup This environmental and social due diligence calls for reviewing compliance of project documentation with Albanian regulations and identifying gaps in regulatory compliance; reviewing land acquisition and stakeholder engagement plans against EBRD performance requirements; undertaking interviews with project-affected…

Trans Adriatic Pipeline (TAP) Project 300-m Cadaster ...

Client: TAP Period: 2016-2017 The objective of this assignment is to provide necessary and up-to-date cadastral information for the remaining 300m-corridor for the TAP Project, including collecting, updating and enhancing all information on property boundaries, ownership, rights and usage in areas…

Environmental and Social Due Diligence for the Alban ...

Client: Ove Arup This environmental and social due diligence calls for: reviewing compliance of project documentation with Albanian regulations and identifying gaps in regulatory compliance; reviewing Land Acquisition and Stakeholder Engagement plans against EBRD performance requirements; reviewing the project against…

Cairn Project for Oil Plant in the Adriatic Sea

In support of CAIRN’s plans to drill for oil and build an oil plant in the Adriatic Sea, this project provided a socio-economic baseline study; desk studies; interviews and consultations with potentially affected stakeholders; and support in stakeholder mapping.

Disaster Risk Mitigation Project

This study was part of a larger effort to reduce the social and economic costs to the Republic of Albania of recurrent river flooding. Currently, most efforts are spent on disaster management and urgent rehabilitation of the flood-protection infrastructure; however,

ENEL Power Plant Project in Porto Romano

This project was a socio-economic impact assessment of the potentially affected communities, consisting of a baseline study; desktop studies; secondary data collection; and community profiling. In addition, there were interviews and consultations with potentially

Environmental Due Diligence for Port of Durres

In support of a request to EBRD to consider providing financing to the Port of Durres Dredging Project, this environmental due diligence defined the project and its area of influence (according EBRD Performance Requirement 1 [PR1]); prepared a Stakeholder Engagement

ERM’s Kalivac Hydropower Plant Project

Services provided in this project on the Vjosa River included a socio-economic baseline study; desktop studies and secondary data collection; community profiling (including interviews with institutes and entities holding data); interviews and consultations with

Feasibility Study and Concession Tender Preparation ...

In the light of new priorities for the development of urban transportation in the city of Tirana, and with the goal of having a more feasible project, the Municipality of Tirana has asked for a review of the previous feasibility study for a Multimodal Station of Tirana (2013)

Feasibility Study and Concession Tender Preparation ...

This project is a feasibility study for the Municipality of Tirana, including needed environmental and social analysis for the design of a public transport terminal tender document, such that the city is able to attract a good level of competition for the tender before awarding

Milot-Morine Motorway Maintenance Concession Tender

The objective of the project was to conduct traffic surveys on the Durres-Morine Motorway to assess traffic flow for the purpose of an EGIS Group intention to participate in the tender for the maintenance of the motorway. The survey undertaken (for two weeks with four

Public Service Re-Engineering

The core focus of the project is improving the convenience, and reducing the time taken, to access administrative services for all Albanian citizens. The re-engineering process will aim to simplify service supply by reviewing of business processes, review of the legal

RSK Environmental and ABKONS

Function Social Field Monitor, The purpose of this role is to ensure that the social risks/impacts associated with daily construction activities are effectively managed at a site level. To achieve this the Social Field Monitor (SFM) will work under the supervision of the Senior Site

Scoping and ESIA Process

The purpose of this role is to ensure that the social risks/impacts associated with daily construction activities are effectively managed at the site level. To achieve this, the Social Field Monitor (SFM) will work under the supervision of the Senior Site Representative and Social

Tirana City Development Strategy

The main goal of this project was to support the Municipality of Tirana in developing a long-term strategic framework for sustainable development. The framework should build upon a highly participatory process and close collaboration with key stakeholders

Tirana Public Transport Terminal Project Feasibility ...

This project is a feasibility study for the Municipality of Tirana, including needed environmental and social analysis for the design of a public transport terminal tender document, such that the city is able to attract a good level of competition for the tender before awarding

Tirana Public Transport Terminal Project Feasibility ...

In the light of new priorities for the development of urban transportation in the city of Tirana, and with the goal of having a more feasible project, the Municipality of Tirana has asked for a review of the previous previous feasibility study for a Multimodal Station of Tirana

Wind Sun and Water Initiative

This project proposed to build an energy park that would use wind turbines to produce electricity. This park would be built in the municipalities of Xarre, Ksamil and Livadhja, which are parts of city of Saranda. ABKONS conducted public consultations and public

Wind Sun and Water Initiative

Client: Wind Sun and Water Initiative Partner: GR ALBANIA Period: “January 2012 – December 2012” This project proposed to build an energy park that would use wind turbines to produce electricity. This park would be built in the municipalities of Xarre,…

ENEL Power PlantProject in Porto Romano

Client: ERM Period: March 2009 – October 2009″ This project was a socio-economic impact assessment of the potentially affected communities, consisting of a baseline study; desktop studies; secondary data collection; and community profiling. In addition, there were interviews and consultations with…

Our Clients