thumbnail

Design Services for Improvement of Plepa-Durres-Fier ...

Client: Albstar Period: 07.08.2017-Ongoing The main design tasks to be carried out by the Service Provider will be the preliminary project, consisting of a general technical report, a geological survey, a hydrological study, preliminary structural calculations, general technical considerations and…

bombardier

Work Supervision Services for Fier-Ballsh & Fie ...

Client: ALBRAIL Concessionaire Company Period: 01.09.2017-01.09.2018 The work supervision tasks of the Supervisor shall entail: Periodic inspection of works and quality control in coordination with full-time field engineer; monitoring the construction process and ensuring that construction is carried out in…

36

Devoll Hydropower Project – Archaeological Survey

ABKONS and AD Star are conducting an archaeological field survey in seven sites of the area of Banjë. Phase 1 includes: screening of test points in the field; geophysics tests; and preliminary reports if any findings are identified. Phase 2 includes: monitoring

34

Student City Campus Master Plan

The project is a feasibility study for a Student City Campus master plan. The study looks at urban architectural design concepts for the improvement of facilities in creating new functions within the campus, with the aim of creating a multi-functional and attractive

Our Clients